TM 9-5855-253-10
OPERATION IN FREEZING TEMPERATURES (CONT)
2-25.
(Sheet 2 of 3)
E. Remove heating pads (6) from pad covers (8).
F. Add water to heating pads (6) per directions printed on pad cover (8).
G.
Install heating pads (6) into pad covers (8).
Pack six heating pads (6) into Arctic Kit (1) on all four sides and
H.
between batteries (7).
Install cover (3) on Arctic Kit (1) and secure latches (2).
I.
Connect power cable (4) connector (9) to Arctic Kit connector J7 (10).
J.
Connect power cable (4) connector (11) to Night Sight connector J1 (12).
K.
Set switch S1 (13) to position 1 for first battery, position 2 for second
L.
battery, etc.
The Arctic Kit may be shut down by setting switch S1 (13) to OFF and
M.
removing and stowing power cable (4) in cover (3).
GO TO NEXT PAGE
2-60