T h i s time is
take to perform the check or service.
expressed in tenths of an hour.
Table 31. Operator's Daily Preventive Maintenance
Checks and Services
A--After
D--During
B-Before
Operation
Operation
Operation
Time required: .6 Time required: .1 Time required: .1